 |
Source: http://www.sing365.com
Angel Voices
------Hawkwind
Final adjustment to timing sequences for the master control system
Main engine check
Proton drive unit: PDU meter reads level
Linear acceleration module: LAM meter reads level
Crystal absorption unit: CAU meter reads level
Vector thrust module: VTM meter reads level
Vector Activity:
Vector activity reading is on scope at minus oh two one point seven
Readjustment reccommended
Vector activity reading level
Flight deck computer check complete
Passenger module computer check: Dream Sequencing - functions activated. |